To enable RTS development from planning
stage, Ministry of Urban Development (MoUD)
has recently amended Model Building Bye-
laws for including RTS plants for major building
projects.
To ease and expedite the process of RTS
implementation in Government sector, model
bidding documents for both CAPEX and
RESCO modes has been developed by MNRE;
i.e. Memorandum of Understanding (MoU) for
e x e c u t i o n b e t w e e n O r g a n i s a t i o n /
ULB/Ministry /Departments and PSU,
Engineering, Procurement and Construction
(EPC) Agreement for CAPEX /Ownership
11.4 Standardisation of RTS
Documents
model and for
RESCO /PPA mode RTS projects. All these
documents have been duly vetted by the
Department of Legal Affairs, Ministry of Law
and Justice and Department of Expenditure,
Ministry of Finance. These model documents
2
have been made available in public domain.
MNRE has been collating data about RTS
potential of rooftops and surplus areas of
Government building premises of various
Ministries/Departments. Commitment
Certificates of about 3800MWp has been
re cei ve d fro m di ffe ren t Min is tr ies /
Departments. To expedite the RTS installation
on these in Ministerial and Departmental
buildings, MNRE has shortlisted 11 Public
Sector Undertakings (PSUs) to assist the
Ministries/Departments through Project
Management Consultancy (PMC).
Under such PMC, the scope of work of the
PSUs would essentially cover, but not limited
to coordination with the Ministry/Department,
collection of list of sites, site visits, solar
potential assessment, technical evaluation,
finalisation of feasibility report, finalization of
bidding documents in either CAPEX or RESCO
mode, collation of State wise projects for
economics of scale, submission of project
proposals and project completion reports
(PCRs) in SPIN portal, getting sanction from
Power Purchase Agreement
11.5 Implementation of RTS on all
Government Rooftops
MNRE, undertaking bidding process,
s e l e c t i o n o f v e n d o r s , m o n i t o r i n g
implementation, ensuring net metering as per
the State/UT policies, quality control,
supervision during O&M period, dispute
resolution and contract management.
SECI has undertaken competitive bidding at
national level for 50 MWp grid connected
rooftop projects in RESCO mode on buildings
of Central Public Works Department. In this
scheme Power Purchase Agreements have
been signed between CPWD and various
developers on the basis of allotment and
installation is into progress.
SECI has undertaken competitive bidding at
national level for 500 MWp grid connected
rooftop projects. CFA (subsidy) of 30% of the
benchmark cost for residential, institutional
and social sector will be provided through
SECI under this scheme. A total of 122
developer/Installers have been selected for
RTS installations across the country. CFA is not
applicable for private commercial and
industrial sector.
Interested roof owners may get the state wise
list of successful developers with quoted price
11.6 50 MW Rooftop Solar on
CPWD Buildings
11.7 500 MWp Grid Connected
Rooftop Power Plant Scheme
4
from and contact Solar
Energy Corporation of India for further details.
SECI has issued tender for development of
1000 MWp of rooftop solar power project(s) on
pre identified government owned buildings.
Out of the entire tendered capacity, 700 MWp
is to be implemented under the RESCO route
where the project shall be owned, developed
& maintained by the developer (3rd party).
Balance 300 MWp shall be implemented under
5
the CAPEX mode.
MNRE has liaised with World Bank, Asian
Development Bank, GIZ, European Union and
USAID to provide technical assistance and
support for RTS programme. Thus the PV
Rooftop Cell has been established at MNRE
under the technical cooperation with the
European Union in order to expedite Rooftop
Solar implementation and to support
stakeholders.
MNRE has also collaborated with USAID, ADB,
WB and GIZ for technical support to DISCOMs
and SNA for faster deployment of grid
connected rooftop solar. The support from
these multilateral/ bilateral institutions to the
allocated DISCOMs/SNAs will, inter alia, cover
http://seci.gov.in
11.8 1000 MWp Grid Connected
Rooftop Power Plant Scheme
11.9 Technical Assistance /
Cooperation
3
http://solarrooftop.gov.in/notification/Notification-01122016.pdf
4
http://seci.gov.in/upload/files/what_new/news/5867363c5b168ListofsuccessfulbiddersRooftop500MW.pdf
5
http://www.seci.gov.in/upload/ uploadfiles/files/Final%20Tender%20Documents%20for%201000MW%20RT%20Solar%
20PV%20Tender.pdf
495 kWp, Govt. College for Girls, Chandigarh
2
http://solarrooftop.gov.in/notification/Notification-
24112016.pdf
24 25